Arkwright
Can the Engineer's free administrative cost be set to zero, or spent above the printed cost on quality?
The designer answered this directly in a post, with no contrary official ruling.
- REAL TIGRIS · Designer · 2018-04-12
- dkeisen · Community · 2015-03-12
- Murr · Community · 2019-05-10
Yes. The Engineer lets you choose the administrative cost, including zero, and a spend such as £12 on quality is allowed. Zero means the action is not carried out, though the tile can still be placed. It applies only to the Quality action.